A critical project for the NSW energy transition

The 900 MW 8-hour pumped hydro project will help NSW replace coal-fired power and support the addition of more renewables to our energy system.

Quick facts

A stylised icon of a renewable battery lifecycle

It will work like a big battery, storing energy by pumping water more than 600 metres uphill from one reservoir to another.

A stylised icon of a waterwheel with a lightning bolt in the centre

When required, water will be quickly released and run through the turbines to produce electricity.

three lightning bolts

At 900 MW for 8 hours, the project would generate up to 7,200 MWh (7.2 GWh) which could power over 600,000 homes.